Methodology library

Train methodology

DEFRA

UK Government conversion factors

UK Government factors per passenger-km for national rail, international rail, light rail and tram, and the London Underground.

Publisher
UK Government (DESNZ)
Best for
Rail travel in the UK and UK-based reporting
Result
One total per trip, for all travellers
Energy scope
WTW by default, TTW optional
Factor year
Selectable; latest supported year by default

How it works

  • International rail is based on Eurostar. Light rail and tram share one UK factor, and underground uses the London Underground factor.
  • There is no diesel or electric choice: the UK publishes one factor per category.

Trip details used

When a detail is missing, SQUAKE uses the default.

DetailDefaultNotes
Origin and destinationRequired without a distanceStations or addresses.
Rail distanceCalculated from the routeReplaces the route-based distance.
Rail categoryNational railNational, international, light rail, tram or underground.
Number of travellers1

What is included

Included

  • Fuel and electricity used by trains
  • Producing and delivering that energy (on by default)

Not included

  • Building and maintaining trains and infrastructure

Limitations

  • One national average per rail category.
  • Factors can change between factor years.

Sources

  1. UK Government: conversion factors for company reportinggov.uk

    Every annual factor set, with its methodology paper.